This project was developed in two phases, with the first phase including the survey and scoping portion of the project. In this phase, a full traffic analysis report was developed using SIDRA to analyze the proposed roundabout incorporating projected trips generated from planned development at the adjacent Applewood Center Plaza, as well as an expanded Ivy Tech Campus. The second phase included the design of a five-legged, one-lane roundabout, which also included improvements to INDOT’s 59th Street and State Route 9 intersection. The roundabout, and all streets and approaches featured HMA pavement, interior splitter curbs with stamped concrete, exterior curb and gutter, and two separate enclosed storm sewer systems.